goodwin

Contact Us

Goodwin Industrial Electric Ltd.
11091 Hammersmith Gate
Richmond, BC
V7A 5E6

 

24 hours a day 7 days a week

604-214-3188
Toll free 1-800-988-0034

 

TESTIMONIALS

In the spring of 1997 Tibury Cement Ltd. introduced the Tilbury Safe Contractor Award. The award recognizes those major contractors who perform their work safely and in accordance with Tilbury rules and WCB regulations during the annual major maintenance shutdown. The intent of the award is to promote making safety an integral part of the planning and executing of all jobs done. I am pleased to report that Goodwin Industrial Electric Ltd. did meet this high level of safety performance. It is of special note that Goodwin is the first and only repeat recipient of the award. All of us at Tilbury congratulate you and your employees.

Tilbury Cement Ltd. 


 

Goodwin Electric has always gone the extra mile for us, and succeeded where other suppliers have let us down or could not produce results. Goodwin Electric has been a pleasure to deal with from the support staff on the phones, courteous and professional, to the supervisors and the electricians onsite, everyone has the right attitude towards getting the job done and supplying full support for what ever we need. Good job everyone, it is very much appreciated.

D.B.
Maintenance supervisor


 

We would like to thank you for the hard, dedicated work and support you gave the Powell River #19 Power Boiler Project as it went from conception to production. It has truly been a good project.

H.B.
Engineering Services


 

We would like to take this opportunity to thank you and your staff for a job well done on the installation of the MHI Single Facer. The team effort put together was what made this installation s success.

Best wishes.
J.A.
Domtar


 

This email acknowledges Goodwin’s extra work to complete the air-blaster installation at the end of our yearly maintenance shutdown. While the electrical portion of this installation was under a tight time-line, Goodwin’s team maintained safe work practices. The Goodwin crew skipped coffee breaks and worked the weekend, they should be commended for their hard work to complete all wiring by Saturday afternoon.

W.S.
Systems and Automation Supervisor